Skip to content
Kuleli Military High School
- Installation of 29.500.000 kcal/h boiler room and intermediate pressure reduction stations, installation of polyethylene and steel pipelines and heat exchanger buildings, natural gas system and gas pressure system.
- Automation system integration.