Başakşehir Solid Waste Transfer Station and PV Installation

  • There are 6 trailer areas in an area of 39.000 m².
  • A transfer station of 3,675 m² for 12 vehicles consists of an administrative building of 494 m².
  • 192 kWp GES installation.